Financial Report Regarding Bathroom Renovation in Burty Orphanage

Are you ready for our financial report?

 

TulSun Foundation has spent UAH 173 465,22 on the bathroom renovation in the Sonechko Social Rehabilitation Center. We don’t know how other people are, but our team is astonished by this figure. And we can assure everyone that every penny of that amount has been spent for good. Now children have not only a better but also a much bigger bathroom.

 

In the renovation process, we realized that the children needed more comfort and decided to redesign the premises. Thus the bedroom became a bathroom, which now contains both a shower cabin and a bath. We also repaired the toilet and installed water filtration to remove excess iron. Now our kids can not only make daily hygiene procedures comfortably, but also save their time.

 

Take part in TulSun Foundation projects and contribute to the future of those who really need it!

3
Connecting Orphans With Sports Professions
3
Stages II and III of Annual Rehabilitation Course for Six Children Done
3
612,015.80 UAH Spent on the Rehabilitation of Six Disabled Children in 2023

Forum Victoria Park,

Okhtyrskyi Lane 7, 

Kyiv, Ukraine, 03680

info@tulsun.foundation

Navigation

Our Projects